- All
- Quantity Surveying
- Project Management
- Aviation
- Civic and Public Domain
- Advisory
- Quantity Surveying
- Education
- Healthcare and Sciences
- Hotels and Leisure
- Industrial
- Land Subdivisions
- Mixed Use Developments
- Offices
- Marine Development
- Public Private Partnerships (PPP)
- Residential & Urban development
- Retail
- Retirement & Assisted Living
- Roads, Rail and Transport
- Sports
- Carpark
- Heritage
- Masterplanning
- Social Housing
- Utilities
- Ports
- Team
- Tourism & Leisure
- Green Star
- Fitout
Papaiōea Place
Palmerston North
An exemplar social housing project for land efficiency, innovation and sustainability outcomes.
Sakura Project, Packaging Southern – Oji Fibre Solutions
Christchurch
Oji Fibre Solutions have invested in a new 36,000m2 purpose-built Packaging Southern facility in Hornby, Christchurch.
22 The Terrace, Qual IT House
Wellington
Multi award-winning 5 Green Star redevelopment in the heart of Wellington's CBD
The Langlands Hotel
Invercargill
The Langlands Hotel is Invercargill’s newest accommodation experience. This seven-storey, 78-room, 4.5 star hotel brings contemporary style to the inner city CBD.
Central Energy Trust Arena
Palmerston North
WT provided Project Management and Quantity Surveying services for the award-winning Central Energy Trust Arena in Palmerston North.
Te Pou Toetoe Linwood Pool
Christchurch
WT provided Quantity Surveying and Cost Management services for the award-winning Te Pou Toetoe Linwood Pool Development in Christchurch.
Pareawa Banks Avenue School
Christchurch
WT provided full Quantity Surveying services throughout the Pareawa Banks Avenue School project.
Te Raekura Redcliffs School
Christchurch
Te Raekura Redcliffs School is a beacon project for the Ministry of Education in terms of design sustainability for an attractive, sustainable and functional modern learning environment.
UBS Office Fitout
Auckland
UBS's latest office fitout creates a sophisticated environment designed to support collaboration and collegiality
Te Matapihi – Bulls Community Centre
Manawatu-Wanganui
WT assisted in the completion of the Te Matapihi Bulls Community Centre to conclude governance, budget, programme, and contractual issues.
19 Timberly Road
Auckland
WT provided full project management and engineer to the contract services for Auckland International Airport Limited's 19 Timberly Road
51 Corinthian Drive Westpac Fitout
Auckland
WT was engaged to provide full project management & contract administration services as engineer to the contract for Westpac's Albany Office.
Spark Square
Christchurch
The first new commercial building to open in Cathedral Square during Canterbury's earthquake rebuild, the prominent and visible location of the Spark Christchurch new build demanded a building of special quality and design excellence.
Park Hyatt Hotel
Auckland
We were appointed as the Project QS for the construction of New Zealand’s first Park Hyatt hotel, in Wynyard Quarter, Auckland.
Kerewhenua & Uku Development
Auckland
Kerewhenua and Uku are two new neighbourhoods that were developed at Hobsonville Point, Auckland.
Unitec Institute of Technology, Mataaho (Trades Skills Building)
Auckland
This new built facility of 7,000m2 amalgamates a number of existing trade sectors previously operating out of separate buildings across the Unitec campus.
Unitec Institute of Technology, Te Puna / The Hub
Auckland
The project included infilling of the large external open space between 2 existing buildings with a multi-level atrium and open student places providing a year round functional education space.
St Marks Apartments
Auckland
This project is organised into three distinct buildings, which include high-quality apartments, food establishments and 4,000m2 of office building.
Britomart Precinct
Auckland
Britomart Precinct is a 6.5-hectare waterfront precinct of heritage buildings, new developments and open and intimate public spaces. It is immediately adjacent to Auckland’s main transport hub, Britomart Transport Centre.
Anglesea Tower Seismic Strengthening
Hamilton
The Contract Works included the retrofit of a structural steel to provide additional floor seating to the existing concrete hollow core floor planks at each column junction.
ANZ Viaduct Event Centre
Auckland
Auckland City Council has developed this 3,000 m² exhibition and conference facility on Auckland’s viaduct harbour.
City Rail Link
Auckland
The City Rail Link (CRL) Project provides Auckland with additional city centre train stations whilst improving the efficiency of the existing train network.
Northern Grid Alliance
Whakamaru to Auckland
The North Island Grid Upgrade Project was one of the largest transmission projects to be undertaken in New Zealand since 1960. The project involved building a new power link between Whakamaru and Auckland.
Project Pure – Wastewater Treatment Plant and Reticulation
Queenstown lakes
Project Pure is the wastewater system for the townships of Wanaka and Albert Town. As the treatment plant is located six kilometres out of town, a network comprised of a new pump station and large diameter pipes were required.
Pukete Wastewater Treatment Plant
Hamilton
The Pukete 2 upgrade provided the improved quality, capacity and security for the future of Hamilton’s wastewater treatment.
AMI Stadium
Christchurch
The ground and buildings were redeveloped following the earthquakes and now serves as the venue for provincial and international rugby union and league matches, and outdoor arena concerts and shows.
Christchurch Netball Centre
Christchurch
This stylish building is nestled amongst the trees in Hagley Park. Following the series of Canterbury earthquakes, the existing building required earthquake repair and structural strengthening works, including sub-floor grouting and re-levelling, together with Business-As-Usual refurbishment including new roof coverings, exterior glazed joinery, internal joinery, finishes and electrical and fire services upgrades.
Social Housing Portfolio, Christchurch
Christchurch
As part of the Christchurch City Council earthquake stock replenishment scheme, we provided full quantity surveying services on a number of social housing projects.
Housing New Zealand Corporation (HNZC) Rightsize Programme
Nationwide
The initial development program was for 396 properties split amongst 5 contractors which was completed in 2014.
Auckland Road Maintenance Alliance (ARMA)
Auckland
WT Infrastructure acted as Cost Auditors for Auckland Transport. This included the agreement of Target Outturn Costs of areas of the programme and the validation of submitted costs by the Alliance.
Auckland Light Rail Transit
Auckland
WT provided concept estimates for the business case for a proposed Auckland light rail network for the isthmus, including Queen Street, Dominion Road, Sandringham Road, Mt Eden Road, Manukau Road plus a future route to Auckland airport.
Christchurch Blueprint
Christchurch
We were engaged as part of the original ‘Blueprint 100’ team, and worked closely with a select group of consultants to develop high level cost estimates to inform the blueprint/masterplan for the recovery of Christchurch post the 2010/2011 earthquake events.
KiwiRail Electrification Program
Auckland and Wellington
WT's role included full cost management and reporting on the bridge replacement projects at Manurewa, Church Street, Clevedon Road and Mt Wellington Highway.
Holly Lea Village
Christchurch
This project involved the construction of 3 new build residential care buildings incorporated into an existing village, comprising of 28 high end independent apartments and 34 assisted living suites.
Ranfurly Village
auckland
The Ranfurly Village apartments are high specification purpose-built accommodation to allow residents to “age in place” with onsite facilities for recreation and care.
The Russley Village
Christchurch
The Russley Village Block D (Sefton Apartments) and Block E (Ashley Suites) are two new build luxury aged care facilities, situated within an existing village, offering both independent apartment living and assisted care rooms.
Te Awa – The Base
Hamilton
The project was the construction of a new 25,000m2 shopping mall incorporating Farmers department store, specialty shops over two levels, fresh food and fast food court, a multi-screen cinema complex and associated car parking and landscaping.
Shore City Seismic Refurbishment
Auckland
The project was for the retrofit and seismic strengthening to a 40+ year old shopping complex located in Takapuna, Auckland.
BNZ Retail Fitouts
nationwide
WT worked alongside BNZ to roll out new retail design to a selection of stores.
The International
Auckland
The project consisted of the conversion of the historic Grand Hotel and previously Fonterra office building into 88 high-quality apartments including ground floor communal facilities.
New Zealand Schools PPP3
Nationwide
This project is under a PPP contract with the Ministry of Education and the ShapEd consortium. It consists of the design, construction and 25-year maintenance of five new schools in Auckland, Hamilton and Christchurch.
New Zealand Schools PPP1
Auckland
The project consisted of the design, build, finance and maintenance of a new primary school (690 pupils) and a new secondary school (1,500 pupils) located at Hobsonville Point, West Auckland.
Channel Deepening Project, Lyttelton
Christchurch
To keep pace with international shipping trends for larger, deeper vessels, LPC proposed to deepen and lengthen the existing Lyttelton Harbour/Whakaraupo shipping channel.
Cruise Berth, Lyttelton
christchurch
The new cruise berth is the first custom built cruise ship facility for Christchurch and will be able to accommodate some of the largest cruise liners from around the world.
Oil Berth, Lyttelton
christchurch
Through structural strengthening and refurbishment it is hoped to prolong the life of the structure by a further 15 years.
Te Awaparahi Bay Terminal Development, Lyttelton
Christchurch
The extension of the container terminal at Lyttelton into Te Awaparahi Bay, includes the reclamation of approximately 16ha of land for port activities.
Centreport
Wellington
We were engaged by Centreport to provide assistance for their insurance claim following the November 2016 Kaikoura earthquake.
14 Show Place
Christchurch
We were involved with the base-build and fit-out at 14 Show Place, an impressive building with a modern feel, incorporating environmental sustainability and seismic strengthening principles.
Aurecon House
Christchurch
This project included the high end fit-out works of Aurecon’s commercial offices within King Edward Barracks - a Ngāi Tahu Property Development.
Waterfront House, Lyttelton
Christchurch
This new build project included the construction of new offices and operations facilities for the Lyttelton Port Company comprising approximately 2800m² of gross floor area.
ANZ Property Portfolio
Nationwide
The ANZ ‘Optimisation’ Program comprised the consolidation and refurbishment of ANZ’s nationwide property portfolio following the merger with National Bank in 2012.
ASB Retail & Corporate Fitout Program
Nationwide
We worked alongside ASB to deliver fitout projects under the Business as Usual (BAU) nationwide program of works. Works included seismic upgrades to branches, fitouts of corporate offices, refurbishments of office spaces to suit activity based workspaces and other sundry projects.
BNZ TSS Rollout Program
Nationwide
WT worked with BNZ to roll out Transactional Self Service (TSS) ATM Machines to their retail network.
Auckland Council Investigation and Design Program
Auckland
To assist advancing internal projects on land and buildings owned by Auckland Council We were engaged to manage their investigation and design process to provide solutions for a range of assets needing urgent attention to provide better uses to be enjoyed by the communities they were located in throughout the greater Auckland region.
Regeneration Area Master Plan
Christchurch
Regenerate Christchurch was tasked with providing a long term master plan for the redevelopment of the area, for which we provided cost advice, including the development of a cost model.
Stronger Christchurch Infrastructure Rebuild Team (SCIRT)
Christchurch
Following the September 2010 and February 2011 earthquake events in Christchurch, we were appointed to carry out infrastructure rebuild estimates for works including land remediation, roads, bridges, utility services, water treatment and infrastructure assets.
Westgate Town Centre
Auckland
Auckland Council, in conjunction with NZRPG, developed the new Massey North Town Centre incorporating a 3,500m2 three-storey regional library, a town square, community park, mall-style retail, office accommodation, large format retail precinct and a yard-based retail precinct.
Paerata Rise
Auckland
Paerata Rise is a new build lifestyle community developed between Karaka and Pukekohe, approximately 40 minutes from Central Auckland, comprising 4,500 new houses intertwined with green spaces, cycle paths and walkways. It includes 5ha of neighbourhood reserves, schools, a retail precinct, and a transport hub with a railway station.
Auranga, Drury
Auckland
A new community in Drury reflecting the look and feel of Auckland’s traditional neighbourhoods, with all the modern conveniences of urban living. Roads lead to the village centre with its sunny square, playground and shops, attractive open spaces and the water's edge, and walkable, bike-able streets with lush landscaping.
Spark Data Centre
Christchurch
This project included the construction of a new Tier 3, IL4 Data Centre for Spark Digital in Christchurch, comprising approximately 5000m² of ground floor area.
Mainstream Truck Park Redevelopment
Auckland
Mainstream acquired the former scrapyard site to be used for overflow truck parking but due to a change of use, a Resource Consent was required to develop the site.
Bunnings Warehouse
Porirua
An annual building warrant of fitness (BWOF) inspection raised the requirement for fire compliance upgrades to the existing Bunning warehouse in Porirua.
Hilton, Level 8
Auckland
The project comprised the conversion of the top floor penthouse into 21 new guestrooms including the complete replacement of envelope and roof.
Ibis & Novotel Hotels
Christchurch
Working within the constraints on the Christchurch City central business district following the Canterbury earthquakes, we provided cost estimates for options analysis and rigorous cost control on the cost reimbursement contract.
The Old Registry Building, Arts Centre, Christchurch
Christchurch
The first restoration stage of this heritage rated category 1 building included some demolition, removing tagging, reinstating existing timber floors, doors, architraves and wall panelling, through to complete seismic strengthening works.
Auckland War Memorial Museum
auckland
We are working on the master planning stage of this 20 year project, which will future proof the museum, so that it continues to be relevant and cutting edge in our increasingly technological, dynamic and culturally diverse world.
Rolleston Christian School
Rolleston
Rolleston Christian School is an established state-integrated primary school for children in years one to eight. We were engaged as the Quantity Surveyors for Stage 1 which has been completed.
Pegasus Bay School
Canterbury
This project includes the construction of Phase 2 for Pegasus School comprising approximately 650m² of ground floor area.
Medbury School, Christchurch
Christchurch
We were engaged to undertake full pre and post contract quantity surveying for this private boys primary school in Fendalton.
Daldy and Halsey Street
Auckland
The upgrade of Daldy and Halsey Streets in the Wynyard Quarter provides a new urban landscape linking the Quarter to Fanshawe Street, Victoria Park and the CBD.
i-SITE Visitor Information Centre
Christchurch
This project involved a tenant fit out of two spaces in The Christchurch Arts Centre.
Ōrauwhata: Bishopdale Library & Community Centre
Christchurch
Ōrauwhata: Bishopdale Library & Community Centre is an award winning 800m², single storey building combining a library and community hall.
Avon River Precinct, North and East Frame
Christchurch
The 3.2km long Te Papa Ōtākaro/Avon River Precinct was a key anchor project in the Christchurch Central Recovery Plan.
Aranui Wainoni Community Centre
Christchurch
The Aranui Wainoni Community Centre is sited on Wainoni Park and replaces facilities demolished following damage sustained from the Canterbury earthquakes.
Britomart Oriental Car Park
Auckland
The project was to build the Oriental Car Park (renamed to Britomart Car Park) with enough capacity to cater for the new buildings being constructed and the expected number of visitors to the Britomart precinct (1,200 spaces).
Les Mills Car Park
Auckland
The scheme comprised the construction of a new build 333 space multi-storey car park located on a prominent position on Wellesley Street, within the tight confines of the existing Les Mills site.
AIAL Taxiway Lima
Auckland
Taxiway Lima is a Code F taxiway built to provide links for the latest wide bodied aircraft to the international contact stands.
AIAL Expansion Project
Auckland
As part of the overall Airport Expansion Program the Northern Runway and Terminal Development Projects included landside access, domestic and international terminal runway, taxiways and aprons.
Event Cinema
Auckland
The project was for the fitout of a 10 screen cinema complex for SkyCity Cinemas in extension to Westfield Shopping Centre, Manukau.
Pipitea Plaza
Wellington
Pipitea Plaza is a 16,500m² nine-storey office block in Thorndon, Wellington, which was constructed for tenancy by a government agency. It contains office space, technician space, secure storage, a gymnasium and childcare facilities.
Remuera Rise
auckland
Remuera Rise offers luxury apartment living and a boutique 12-bed hospital level care facility available to both apartment and non-apartment owners.
Westpac Charter House
auckland
Westpac Charter House is a 'Green' office development in the Britomart Precinct, downtown Auckland. Construction of the 9,000m² commercial space included basement car park and refurbishment of heritage buildings.
Spark Indoor Arena
auckland
Auckland City and Jacobsen Venue Management combined forces in a Build-Own-Operate-Transfer (BOOT) scheme to provide a world class indoor sports and entertainment venue.
Tepid Baths
Auckland
Tepid Baths was a substantial redevelopment of this iconic heritage aquatic facility located on a difficult inner city site surrounded by main arterial routes.
Sugartree Apartments
Auckland
SugarTree is a unique, multi-faceted development that brings together apartments, retail, entertainment and workspace.
St Patrick’s Square
auckland
WT completed the full Pre and Post Contract commercial administration for the project including production of estimates from concept to pre-tender stages, Tender Documents and Cost Management and reporting.
SKYCITY Cinema, Westfield Albany Mega Centre
Auckland
This project was for the fit out of a ten-screen cinema complex for SkyCity Cinemas in the Westfield Albany Mega Centre.
Rialto Cinemas, Newmarket
auckland
The project entailed the refurbishment and construction of additional cinemas for the Rialto Cinema Group’s Newmarket Cinemas.
Rangiora Health Hub
Rangiora
WT worked closely with Noordanus Architects and provided full Quantity Surveying and Construction Cost Management services on this project.
Queensgate Cinemas
wellington
The new multiplex offers a total of 1,722 seats, with seven mainstream movie auditoria, including a 360-seat “Mega-Screen” (large cinema screen) and two 40-seat premium Gold Class cinemas.
Onehunga Foreshore
Auckland
The restoration of Onehunga Foreshore is thought to be the world’s largest foreshore reclamation project for recreational purposes.
O-I Glass Furnace Project
auckland
The AK-4 project entailed a major expansion to the manufacturing capability by adding another complete manufacturing chain from raw material through to wrapping of bottles on pallets.
New Zealand Schools PPP2
Nationwide
Future Schools Partners consortium was awarded the contract to finance, design, construct and maintain Ormiston Junior College in Auckland, Aranui Community Campus and Rolleston College in Canterbury and Wakatipu High School in Queenstown.
Mt Eden Sewer Upgrade
auckland
This project was undertaken by Auckland City Council and procured under a NEC3 target cost agreement, which consisted of 385m of 1,950mm diameter stormwater pipe.
Maritime Square, Devonport
auckland
The works included an upgrade to the Devonport wharf and the development of Maritime Square to create a memorable entrance space into Devonport from the ferry terminal, and to create an area that works for all forms of transport and pedestrians whilst encouraging development and economic growth in the area.
Manukau Institute of Technology, Train Station Campus
auckland
The project is a Joint Venture between MIT and Auckland Transport to provide a modern and future-proofed tertiary educational facility and integrated transport hub in the heart of South Auckland.
Cashin Quay 2, Lyttelton
christchurch
The project involved the demolition of the existing earthquake damaged timber piled wharf and rebuild of a new 230m steel pile and concrete deck wharf structure and associated pavement apron.
Highbrook Business Centre
auckland
Highbrook is a world class business park in east Tamaki, Auckland. It is home to small, medium and large businesses in a balanced mix of commercial, retail, distribution and clean manufacturing.
Eden Park Redevelopment
Auckland
The redevelopment of Eden Park Stadium for the 2011 Rugby World achieved Practical Completion in August 2010. The project included a three tier South Stand which includes the main players changing facilities, 52 corporate boxes, hospitality lounges, public concourses, commentary and broadcast suites and seating for 21,500.