Project Description
Services:
Client:
Queenstown Lakes District Council
Project Value:
$20 million
Project Pure is the wastewater system for the townships of Wanaka and Albert Town. As the treatment plant is located six kilometres out of town, a network comprised of a new pump station and large diameter pipes were required. Key features of the State Highway 6 Pump Station facility include a bark chip bio filter for odour treatment and a stacked schist facade on the control building.
Our role included pre-design estimate reviews, preparation of tender documents, detailed design estimates, tender evaluation and negotiation and full post contract cost control including final account preparation and negotiations.